Transmission Elements Outage Report for 17-01-2017

A. Details of Transmission Elements under Planned Outage:-
S.NoElement NameTypeVoltage LevelOwnerOutageRevivalExpected Date of RevivalReason / Remarks
DateTimeDateTime
1Balia-Varanasi 1Line765 kVPGCIL17-01-201709:4917-01-201717:04-Planned annual maintenanceMaintenance works at Varanasi PG by Powergrid.
2Meerut 765KV Bus 2BUS765 kVPGCIL17-01-201708:5417-01-201718:04-Polymer insulator replacement---- for erection of tower (s) and beam in 765kv swichyard (under construction)
3765 kV / 400 kV ICT-2 Main Bay (712) at Bareilly II (PG)BAY/CB765 kVPGCIL17-01-201710:2517-01-201716:57-For AMP Works of CB and bay CTs.
4Baspa(HP)-Karchamwangtoo(JP) 2Line400 kVJPHYDRO13-12-201608:42**19-01-2017For testing of line protection and GIS Maintenance at K.Wangtoo HEP.
5Sarnath(UP)-Varanasi(PG) 1Line400 kVPGCIL11-01-201714:0317-01-201708:39-Due to overrloading of Anpara-Sarnath line
6Amritsar(PG)-Makhu(PSEB) -1Line400 kVPSEB15-01-201710:57**19-01-2017Diverson of Linefor String/sagging works of shifting of 7 nos. Towers, due to 4- laning works near Harike By pass Road by PSTL
7Amritsar(PG)-Makhu(PSEB) -2Line400 kVPSEB15-01-201710:57**19-01-2017Diverson of Linefor String/sagging works of shifting of 7 nos. Towers, due to 4- laning works near Harike By pass Road by PSTL
8Muzaffarnagar-Vishnuprayag 1Line400 kVUPPTCL17-01-201707:5517-01-201719:09-Polymer insulator replacement--- For replacement of porcelain disc insulators with polymer insulators strings in the line.
9Hisar-Kaithal 2Line400 kVPGCIL17-01-201708:4217-01-201719:15-Construction of new element -- for stringing ( Powerline crossing between loc 45&46) of 400kv Jind -Kirori D/C lines ( line under construction by HVPNL.
10Hisar-Kaithal 1Line400 kVPGCIL17-01-201708:4417-01-201719:14-Polymer insulator replacement-- for stringing ( Powerline crossing between loc 45&46) of 400kv Jind -Kirori D/C lines ( line under construction by HVPNL.
11Agra-UnnaoLine400 kVUPPTCL17-01-201709:0017-01-201721:04-1For replacement of porcelain disc insulators with polymer insulators string.2.Stringing ( Powerline crossing)of 400kv Lucknow 765-Kanpur GIS D/C .
12Koteshwar Pool(PG)-Koteshwar(THDC) 2Line400 kVPGCIL17-01-201709:0917-01-201716:59---- for facilitating conductor connection of new 125MVAR Bus reactor at Koteshwar HEP sub station (work to be done by Powergrid)
13Koteshwar Pool(PG)-Koteshwar(THDC) 1Line400 kVPGCIL17-01-201709:0917-01-201716:59-Construction of new element --- for facilitating conductor connection of new 125MVAR Bus reactor at Koteshwar HEP sub station (work to be done by Powergrid)
14Jhakri(SJVNL)-Rampur(SJVNL) -1Line400 kVPGCIL17-01-201710:0517-01-201717:35---- for AMP works of bays equipments at Rampur GIS and miscellaneous pending electrical work at Rampur GIS by SJVN Ltd Rampur.
15Azamgarh-SultanpurLine400 kVUPPTCL17-01-201710:1117-01-201712:38-For attending air pressure leakage on transfer bus pantograph isolator of 400kv azamgarh bay
16Dhanonda-Jhajjar CLP-2Line400 kVHVPNL17-01-201710:3317-01-201720:59-For cleaning of porcelain disc insulators and General maintenance in the line and sub-station ends yards .
17Dehar 250 MVA ICTICT400/220 kVBBMB15-10-201608:02**19-01-2017Construction of new element For replacement of 400/220 ,250 MVA ICT (3*83.3 MVA + one spare unit 83.3 MVA) and its associate bay equipments with 315 MVA ICT (3*105 MVA + I spare unit 105 MVA) Transformers of 400/220 KV CGL make under Northern Region Strengthening Scheme at BBMB Dehar.The replacement work will be carried out by PGCIL.
18Dhuri(400) 500 MVA ICT 2ICT400/220 kVPSEB17-11-201610:26**NAFor Complete internal inspection due to Detection of high C2H2 from the test result of PD test conducted at site
19Dadri 500 MVA ICT 2ICT400/220 kVNTPC09-01-201710:02**NABushing oil leakage
20G.Noida 315 MVA ICT 3ICT400/220 kVUPPTCL11-01-201710:40**04-02-2017Replacement of transformer-- For replacement/retrofittment of this 315MVA ICT-3 with new 500MVA ICT.
21Harsh Vihar 315 MVA ICT 2ICT400/220 kVDTL17-01-201713:0517-01-201716:20-To top up oil in conservator of transformer
22New Wanpoh 125 MVAR B/Reactor 1Bus Reactor400 kVPGCIL10-10-201610:09**NATake out due to low voltage.
23400 kV Main CB ( 352A ) of 315MVA ILT-1 at Ratangarh II (RRVPNL) BAY/CB400 kVRRVPNL16-01-201710:20**19-01-2017Over hauling of C.B.
24panipat-Dhulkote 1Line220 kVBBMB02-01-201709:36**19-01-2017To take line reactor Out of serviceFor replacement of old conductor with new conductor for capacity enhancement by BBMB.
25Khurja(UP)-Napp(NPC) 2Line220 kVUPPTCL16-01-201708:08**19-01-2017Polymer insulator replacement-- For replacement of porcelain disc insulators with polymer insulators strings in the line by UPPTCL.
26Anta(NTPC)-RAPS C(NPC)Line220 kVPGCIL17-01-201708:34**18-01-2017Planned annual maintenance-- Annual bay maintenance at Anta end by NTPC.
27AD Hydro(ADHY)-Nallagarh(PG) 1Line220 kVADHYDRO17-01-201710:3917-01-201716:28--- preventive maintenance and cleaning of disc insulators etc by ADH Power ltd.
28FSC of Pampore-2 at KishnprFSC220 kVPGCIL30-10-201212:00**NALine length has reduced after LILO work completion
29FSC of Pampore-1 at KishnprFSC220 kVPGCIL30-10-201212:00**NALine length has reduced after LILO work completion
*-Line still under outage     NA - Not Available

B. Details of Transmission Elements under Forced Outage:-
S.NoElement NameTypeVoltage LevelOwnerOutageRevivalExpected Date of RevivalReason / Remarks
DateTimeDateTime
1Meerut 1500 MVA ICT 2ICT765/400 kVPGCIL12-01-201712:36**NAfor tap changing 9 to 11
2G.Noida 765 (3*80) 240 MVAR (765kV) Bus Reactor 1Bus Reactor765 kVUPPTCL06-08-201610:32**NATo attend Buchholz alarm in R phase
3Bamnauli(DTL)-Jatikala(PG) 1Line400 kVDTL22-05-201620:29**NATower damage (First dead end tower from Bamnauli S/S) / Ckt-II charge through ERS tower
4Sarnath(UP)-Varanasi(PG) 2Line400 kVPGCIL16-01-201716:58**NATo attend problem at ABCB breaker.
5Ajmer II-DidwanaLine400 kVRRVPNL16-01-201717:1117-01-201708:57-.
6Alaknanda HEP(UP)-Srinagar(UTT) 1Line400 kVUPCL17-01-201700:3017-01-201705:46-Phase to earth fault.
7Fatehpur(PG)-Unchahar TPS(NTPC) 2Line400 kVPGCIL17-01-201711:1917-01-201719:20-to facilitate material shifting/ Crane movement
8Muradnagar-MuzaffarnagarLine400 kVUPPTCL17-01-201716:3517-01-201719:01-To attend hot spot at Line side Isolator
9Kalisindh 315 MVA ICTICT400/220 kVRRVPNL04-06-201615:50**NABuchholz relay operated.
10Bawana 315 MVA ICT 1ICT400/220 kVDTL11-12-201608:37**NAFire in ICT-1
11Jodhpur II 315 MVA ICT 2ICT400/220 kVRRVPNL24-12-201614:11**NAR-ph HV side bushing burst.
12 Bareilly 50 MVAR B/RBus Reactor400 kVUPPTCL05-08-200700:00**NAFailure of Reactor.
13 Sarnath 50 MVAR B/RBus Reactor400 kVUPPTCL16-02-200906:14**NAFailure of Reactor.
14FSC of Bareilly-I at UnnaoFSC400 kVPGCIL19-04-201513:10**NAFire in FSC.
15Wagoora 50 MVAR B/RBus Reactor400 kVPGCIL22-04-201518:56**NATake out due to low voltage.
16FSC ( 50% ) of Koteshwar Pool -2 at Meerut (PG)FSC400 kVPGCIL16-07-201513:01**NAFire in FSC-2 at Meerut.
17FACT at BLB in Knp-BLB LineFACTS400 kVPGCIL02-07-201610:20**NAY-Phase current imbalance
18Mandola(PG)-Wazirabad(DTL) 2Line220 kVDTL16-01-201710:44**NAE/s/d availed for Repair of conductor
*-Line still under outage     NA - Not Available

C. Details of Transmission Elements Opened manually due to High Voltage:-
S.NoElement NameTypeVoltage LevelOwnerOutageRevivalRemarks
DateTimeDateTime
1Bhiwani -MeerutLine765 kVPGCIL16-01-201723:3917-01-201708:07 
2Meerut - MogaLine765 kVPGCIL17-01-201700:4217-01-201708:04 
3Agra-FatehpurLine765 kVPGCIL17-01-201701:3217-01-201708:16 
4Agra-FatehpurLine765 kVPGCIL17-01-201722:05**** 
5Meerut - MogaLine765 kVPGCIL17-01-201722:07**** 
6Bhiwani-Jind 1Line400 kVPGCIL31-12-201601:39**** 
7Ratangarh-Suratgarh 2Line400 kVRRVPNL03-01-201704:4217-01-201712:14 
8Amritsar(PG)-Makhu(PSEB) -1Line400 kVPSEB14-01-201700:28**** 
9Dhuri(400kv) -Talwandi Sabo 1Line400 kVPSEB16-01-201700:18**** 
10Jhakri(SJVNL)-Karchamwangtoo(JP) 1Line400 kVJPHYDRO16-01-201720:0417-01-201705:11 
11Jhakri-Panchkula 2Line400 kVPGCIL16-01-201720:0817-01-201705:23 
12Ratangarh (RVPNL) - Sikar (PG) - 1Line400 kVPGCIL16-01-201720:1117-01-201707:09 
13Bhiwadi-Neemrana 1Line400 kVPGCIL16-01-201720:1417-01-201708:10 
14Bikaner-MertaLine400 kVRRVPNL16-01-201720:1417-01-201707:08 
15Agra-Sikar 1Line400 kVPGCIL16-01-201720:1517-01-201709:22 
16Agra-Bhiwadi 2Line400 kVPGCIL16-01-201720:1717-01-201708:02 
17Nallagarh-Patiala 2Line400 kVPGCIL16-01-201721:0717-01-201706:15 
18Amritsar-Parb-pol 1Line400 kVPGCIL16-01-201721:1117-01-201709:44 
19Nallagarh(PG)-Parbati Pool(PG)Line400 kVPKTCL16-01-201721:1217-01-201709:45 
20Chamera pool-Jalandhar 1Line400 kVPGCIL16-01-201721:1517-01-201705:44 
21Chamera pool-Jalandhar 2Line400 kVPGCIL16-01-201721:1617-01-201706:33 
22Jalandhar-Kurukshetra(PG) 1Line400 kVPGCIL16-01-201721:1817-01-201706:30 
23Nallagarh(PG)-Rampur(SJVNL) -1Line400 kVPGCIL16-01-201721:1917-01-201705:29 
24Fatehabad-HisarLine400 kVPGCIL16-01-201721:29**** 
25Abdullapur-Kurukshetra(PG) 1Line400 kVPGCIL16-01-201721:3017-01-201705:40 
26Abdullapur-Panchkula 1Line400 kVPGCIL16-01-201721:3117-01-201705:46 
27Abdullapur-Karchamwangtoo 1Line400 kVJPL16-01-201721:4217-01-201705:18 
28Agra-Jaipur South-1Line400 kVPGCIL16-01-201721:5817-01-201706:22 
29Bhiwadi-HisarLine400 kVPGCIL16-01-201722:0317-01-201709:40 
30Mukatsar -Talwandi Sabo - 1Line400 kVPSEB16-01-201722:42**** 
31Makhu -Mukatsar -1Line400 kVPSEB16-01-201722:44**** 
32Makhu -Nakodar -1Line400 kVPSEB16-01-201723:0417-01-201709:40 
33Nakodar - Rajpura (TH) - 1Line400 kVPSEB16-01-201723:0817-01-201709:51 
34Fatehpur-Mainpuri 1Line400 kVPGCIL16-01-201723:2417-01-201708:20 
35Ballabgarh-Mainpuri 1Line400 kVPGCIL16-01-201723:2517-01-201713:22 
36Agra(PG)-Auraiya(NTPC) 1Line400 kVPGCIL16-01-201723:2617-01-201708:20 
37Ballabgarh-Kanpur 3Line400 kVPGCIL16-01-201723:2917-01-201708:20 
38Jalandhar-Moga 2Line400 kVPGCIL17-01-201700:1717-01-201705:59 
39Koldam(NTPC)-Ludhiana(PG) -2Line400 kVPKTCL17-01-201700:1917-01-201705:54 
40Bawana(DTL)-Mandola(PG) 1Line400 kVDTL17-01-201700:1917-01-201713:31 
41Alaknanda HEP - Muzaffarnagar - 2Line400 kVUPPTCL17-01-201700:3017-01-201705:08 
42Alaknanda HEP(UP)-Srinagar(UTT) 2Line400 kVUPCL17-01-201700:3017-01-201705:48 
43Anpara-MauLine400 kVUPPTCL17-01-201701:12**** 
44Bahadurgarh-Sonepat 2Line400 kVPGCIL17-01-201701:2117-01-201709:25 
45Kurukshetra(PG)-Sonipat 1Line400 kVPGCIL17-01-201701:2717-01-201709:24 
46Kurukshetra(PG)-Malerkotla(PG) 1Line400 kVNRSS31B17-01-201701:3017-01-201707:01 
47Dehar (BBMB)-Rajpura (400kV) (PSEB)Line400 kVBBMB17-01-201701:3417-01-201705:47 
48Jodhpur II-Merta 1Line400 kVRRVPNL17-01-201703:3517-01-201709:05 
49Merta-RatangarhLine400 kVRRVPNL17-01-201704:1017-01-201705:33 
50Chabra-Hindaun IILine400 kVRRVPNL17-01-201704:3817-01-201705:36 
51Ratangarh (RVPNL) - Sikar (PG) - 1Line400 kVPGCIL17-01-201720:02**** 
52Jhakri-Panchkula 2Line400 kVPGCIL17-01-201720:04**** 
53Jhakri(SJVNL)-Karchamwangtoo(JP) 2Line400 kVJPHYDRO17-01-201720:06**** 
54Chamera pool-Jalandhar 2Line400 kVPGCIL17-01-201720:42**** 
55Agra-Bhiwadi 2Line400 kVPGCIL17-01-201720:43**** 
56Bhiwadi-Neemrana 1Line400 kVPGCIL17-01-201720:44**** 
57Agra-Sikar 1Line400 kVPGCIL17-01-201720:44**** 
58Nallagarh(PG)-Rampur(SJVNL) -1Line400 kVPGCIL17-01-201720:47**** 
59Jodhpur II-Merta 1Line400 kVRRVPNL17-01-201720:50**** 
60Jalandhar-Kurukshetra(PG) 1Line400 kVPGCIL17-01-201720:50**** 
61Chamera I(NHPC)-Jalandhar(PG) 2Line400 kVPGCIL17-01-201720:50**** 
62Koldam(NTPC)-Ludhiana(PG) -2Line400 kVPKTCL17-01-201720:50**** 
63Abdullapur-Karchamwangtoo 2Line400 kVJPL17-01-201720:57**** 
64Abdullapur-Kurukshetra(PG) 1Line400 kVPGCIL17-01-201721:37**** 
65Abdullapur-Panchkula 2Line400 kVPGCIL17-01-201721:38**** 
66Kurukshetra(PG)-Sonipat 1Line400 kVPGCIL17-01-201721:41**** 
67Agra-Sikar 2Line400 kVPGCIL17-01-201721:47**** 
68Amritsar-Parb-pol 1Line400 kVPGCIL17-01-201721:48**** 
69Nallagarh-Patiala 1Line400 kVPGCIL17-01-201721:48**** 
70Nallagarh(PG)-Parbati Pool(PG)Line400 kVPKTCL17-01-201721:49**** 
71Bhilwara(PG)-Chabra(RVPNL)Line400 kVRRVPNL17-01-201722:16**** 
72Baspa(HP)-Karchamwangtoo(JP) 1Line400 kVJPHYDRO17-01-201723:00**** 
73Ballabgarh(PG)-Bamnauli(DTL) 2Line400 kVDTL17-01-201723:54**** 
74Mandola(PG)-Wazirabad(DTL) 3Line220 kVDTL17-01-201701:03**** 
** - Line shall be closed subject to voltage permissibility